References

BorsodChem ZRt.:

  • Radiographic testing and liquid penetrant testing in the MDI-1 and MDI-2 Plants;
  • Radiographic testing and liquid penetrant testing of pipes for chemical materials in the TDI-2 Plant;
  • Radiographic testing and liquid penetrant testing in the TDA unit of the TDI-2 Plant;
  • Radiographic testing and liquid penetrant testing in the Chlorine plant;
  • Radiographic testing and liquid penetrant testing in the VCM Plant;
  • Radiographic testing, liquid penetrant testing, and hardness testing in the Nitric Acid plant;
  • Radiographic testing and liquid penetrant testing in the Formalin plant;
  • Radiographic testing and liquid penetrant testing in the plant for hydrochloric acid conversion;
  • Radiographic testing and leak testing of containers of 5000 and 8000 cubic metres;
  • Radiographic testing, liquid penetrant testing, and magnetic particle testing in the Chlorine plant upgraded to membrane cell technology.

Tisza Vegyi Kombinát Nyrt. (Tisza Chemical Combinate) and MOL Petrolkémia Zrt.:

  • Radiographic testing and hardness testing of a furnace in the Olefin-1 Plant;
  • Radiographic testing and liquid penetrant testing in the Olefin-2 Plant;
  • Radiographic testing and liquid penetrant testing in the PE-4 Plant;
  • Radiographic testing and liquid penetrant testing in the PP-4 Plant;
  • Ultrasonic testing in the butadiene production plant;
  • Radiographic testing, magnetic particle testing, and liquid penetrant testing in the TISZA SSBR1 Project.

Further References:

  • Radiographic testing and liquid penetrant testing of heat exchanger (Columbian Tiszai Koromgyártó Kft.);
  • Radiographic testing and liquid penetrant testing in the factory in Kaba (Agroferm Zrt.);
  • Radiographic testing, ultrasonic testing, and liquid penetrant testing in Nyíregyháza Combined Cycle Power Plant (Nyíregyházi Kombinált Ciklusú Erőmű Kft.);
  • Ultrasonic testing, magnetic particle testing, and liquid penetrant testing of (the world’s biggest) bucket wheel excavator and mining conveyor of the lignite mine in Bükkábrány;
  • Radiographic testing, magnetic particle testing, and hardness testing in the units of Tiszalök Hydroelectric Power Plant;
  • Radiographic testing for the overhaul of clinker furnace (Holcim Hungária Zrt. in Miskolc);
  • Radiographic testing of the steel structure of Bridge 456 of Highway M0;
  • Radiographic testing of the steel structure of Danube Bridge of M8 Highway;
  • Radiographic testing of the steel structure of the viaduct of Márkó;
  • Radiographic testing of the steel structure of the River Rába and Floodplain Bridge of Vasvár;
  • Ultrasonic crack testing of the wheelsets of BZ multiple-unit trains and class M41 locomotives;
  • Radiographic testing of the steel structure of EANOS goods wagons;
  • Ultrasonic crack testing of the wheelsets of type KCSV tramcars.